Colorado Deer · GMU 512

Colorado GMU 512 covers 17,638 acres and lies 6 miles south of Monument and 23 miles north-west of Fountain. 100% of it is public land, mostly military (100%). In 2024, 25 people hunted deer here and took 24, a 95% success rate. Its most applied-for hunt, DM512S1R, put up 5 tags (all residencies) in the 2026 draw for 38 nonresident first-choice applicants, 5 of whom drew, and the last tag went to someone with 13 points.

Tags, 2026
30

3 licenses · NR capped at 25%

Applicants
39

first choice, NR

Hunter Success
95%

2024, all licenses

Public Land
100%

100% Other public

Size
28 mi²

17,638 acres

Monument Colorado Springs 512
95%hunter success 2024 · 25 hunters, 24 deer

Boundaries are drawn for orientation only. The written boundary description in the regulations governs.

Every License in GMU 512

90–100% 50–89% 10–49% 1–9% under 1% fewer than 5 tags: one applicant swings it
DF512S1R Standard not open —
DM512S1R Standard 0% 13
Youth 0% (small sample) —

First-choice nonresident odds at your points, 2026 draw. Cut = points the last tag went at; ▲ = points added since the earliest draw on file.

Draw results: CPW 2026 Primary DEER Post Draw Report, retrieved Aug 31, 2026.

If you draw (2026 nonresident fees): Standard $636.03 ($129.11 to apply) · Youth $636.03 ($129.11 to apply). Open Mar 1 – Apr 6, 2027 (expected). Full fee breakdown.

Harvest

Year Hunters Deer Success
2024 25 24 95%
2023 25 22 87%
2022 24 19 80%
2021 28 25 89%

2024 split: rifle 24 (100%) from 25 hunters, 96%

What Colorado Parks and Wildlife publishes after each season, for everyone who hunted the area: harvest statistics, not draw odds. Colorado's figures come from CPW's post-season hunter survey. CPW's 2025 report dropped the per-GMU table in favour of hunt-code rows, so the newest year shown here is 2024. Source: CPW 2024 Statewide Deer Harvest; CPW 2023 Statewide Deer Hunting Harvest…; CPW 2022 Statewide Deer Harvest.

The Ground

Department of Defense 17,621 ac 100%
National Forest 16 ac <1%
Private 1 ac <1%

Source: Bureau of Land Management, Colorado State Office 2026 BLM Surface Management Agency.

▸ Sources 10
  1. CPW 2026 Primary DEER Post Draw Report draw results, retrieved Aug 31, 2026
  2. CPW 2026 2 CCR 406-0 Chapter W-0 General… fees, retrieved Aug 31, 2026
  3. CPW 2026 Big Game Hunting brochure fees, retrieved Aug 31, 2026
  4. CPW 2026 web page fees, retrieved Aug 31, 2026
  5. CPW 2024 Statewide Deer Harvest, retrieved Aug 31, 2026
  6. CPW 2023 Statewide Deer Hunting Harvest… harvest, retrieved Aug 31, 2026
  7. CPW 2022 Statewide Deer Harvest, retrieved Aug 31, 2026
  8. CPW 2021 Statewide Deer Harvest, retrieved Aug 31, 2026
  9. CPW 2026 GMU Boundary, retrieved Aug 31, 2026
  10. Bureau of Land Management, Colorado State Office 2026 BLM Surface Management Agency land ownership, retrieved Aug 31, 2026

About These Numbers

Odds are from the 2026 draw, the latest on file, computed from Colorado Parks and Wildlife's published results. They are what happened in that draw, not a forecast. Under five tags a percentage carries a *, because one applicant either way swings it. A dash means the agency did not publish the number, and a date marked expected is last cycle's schedule rolled forward. How we compute these.

Report an error on this page

Every report is checked against the agency source before we change anything.

We don't take applications: check Colorado Parks and Wildlife's site and apply there.

Prior-draw odds from Colorado Parks and Wildlife's results, not a forecast · Methodology · All Colorado deer hunts